New House with Flooring and Trimwork »  Viewing IMG_0429     [Image 43 of 46]  :: Jump To  
  First slide Previous slide      No EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Second bedroom (nail holes puttied in woodwork)
IMG_0424 * Second bedroom completely done * 449 x 600 * (19KB)

IMG_0425 * Second bedroom * 800 x 600 * (31KB)

IMG_0426 * Living room * 800 x 600 * (22KB)

IMG_0427 * Master bathroom painted * 800 x 600 * (24KB)

IMG_0428 * Master patio * 800 x 600 * (39KB)

Next slide
 
IMG_0429.JPG - 800 x 600 - (27KB)
7/12/05 9:56 PM
IMG_0430 * Second bathroom first coat of paint * 800 x 600 * (23KB)

IMG_0431 * Second bathroom cabinets painted * 800 x 600 * (52KB)

IMG_0432 * A look into the hallway * 800 x 600 * (23KB)

Album last updated on 3/18/06 4:19 PM
Powered by JAlbum 6.2 and BluPlusPlus skin